define( 'WPCACHEHOME', '/home/storage/8/3e/60/safelink5/public_html/wp-content/plugins/wp-super-cache/' ); //Added by WP-Cache Manager Prelude Offshore Installation - safelink.eng.br

Safelink Adaptive Passive Heave Compensator returns from offshore assignment

Poseidon X-4500 320/400 returns from our successful campaign on the Prelude Offshore Installation project offshore Australia. Suction piles and mudmats have been safely installed. See our

Applications for Safelink PHC solution:

  • Remove dynamics through the splash zone
  • Verification of dynamic loads through the splash zone
  • Reduce landing velocity

Features used:

  • Predefined equilibrium position
  • Buoyancy compensation
  • Temperature compensation
  • Depth compensation
  • Monitoring

Comments are closed.